Project References



Project References

Pakarab Fertilizer

Pakarab Fertilizer
  • System Installed: Centum CS3000R3
  • Installation Year: 2009
  • System Size: l/Os approx 950
  • Operator Stations: 8
  • Remarks: Supply of complete DCS ESD system Engineering FAT installation System power SAT and commissioning of DCS and ESD

Pakarab Fertilizer(ESD/ System Integration Project)
  • System Installed: Fertilizer Plant
  • Installation Year: 2009
  • System Size: l/Os approx 550
  • Operator Stations: 8
  • Remarks: Supply of complete DCS ESD system Engineering FAT installation System power SAT and commissioning of DCS and ESD and ESD

Pak Arab Fertilizer Limited
  • Plant: Fertilizer Plant
  • Services: Supply, Engineering, Installation of cable trays, conduit, cable laying, cable termination, field instruments etc.
  • Year: 2006

Oil Refinery
    • Plant: Oil Refinery
    • Services: Supply & Annual services of System.
    • Year: 2006

Fatima Fertilizer

Fatima Fertilizer
  • System Installed: Centum CS3000R3
  • Installation Year: 2009
  • System Size: l/Os approx 7500
  • Remarks: Supply of complete DCS ESD system Engineering FAT installation System power SAT and commissioning of DCS and ESD

Fatima Fertilizer (ESD/ System Integration Project)
  • System Installed: Fertilizer Plant
  • Installation Year: 2009
  • System Size: l/Os approx 3500
  • Remarks: Supply of complete DCS ESD system Engineering FAT installation System power SAT and commissioning of DCS and ESD

Al-Noor Sugar Mills Limited

Shahmurad Sugar Mills Limited System Expansion
  • System Installed: Centum CS3000R3
  • Installation Year: 2008
  • System Size: l/Os approx 160
  • Operator Stations: 2
  • Remarks: Supply Installation Engineering and commissioning of CS3000 R3 DCS

Al-Noor Sugar Mills Limited
  • System Installed: Centum CS3000R3
  • Installation Year: 2006
  • System Size: ll/Os approx 208
  • Operator Stations: 2
  • Remarks: Supply Installation Engineering and commissioning of CS300 R3 DCS

Shahmurad Distillery
  • System Installed: Centum CS3000R3
  • Installation Year: 2004
  • System Size: I/Os approx 500
  • Operator Stations: 3
  • Remarks: Engineering, installation and commissioning done by UEC.

Ehanol/Distillery
  • Plant: Ehanol/Distillery
  • Services: Engineering, fabrication & installation of equipment, piping and other ancillary items.
  • Year: 2007

Ehanol/Distillery
  • Plant: Ethanol/Distillery
  • Services: Complete installation & commissioning of LV/MV cables, switch gear etc.
  • Year: 1994

Pakistan Refinery Limited

Pakistan Refinery Limited
  • System Installed: Centum CS3000R3
  • Installation Year: 2008
  • System Size: l/Os approx 128
  • Operator Stations: 2
  • Remarks: Supply Installation Engineering and commissioning of CS3000 R3 DCS

Descon Oxychem Limited

Descon Oxychem Limited
  • System Installed: Centum CS3000R3
  • Installation Year: 2008
  • System Size: l/Os approx 128
  • Operator Stations: 2
  • Remarks: Supply Installation Engineering and commissioning of CS3000 R3 DCS

Fertil Urea Plant UAE
  • Plant: Fertil Urea Plant UAE
  • Services: Supply of Field Instruments.
  • Year: 2009

Bosicor Refinery

Bosicor Refinery System Expansion
  • System Installed: Centum CS3000R3
  • Installation Year: 2006
  • System Size: l/Os approx 250
  • Operator Stations: 1
  • Remarks: Supply Installation Engineering and commissioning of CS3000 R3 DCS

Bosicor
  • System Installed: Centum CS3000R3
  • Installation Year: 2005
  • System Size: l/Os approx 250
  • Operator Stations: 2005
  • Remarks: Supply, Installation, Engineering and commissioning of DCS system

Bosicor Refinery System Expansion
  • System Installed: Centum CS3000R3
  • Installation Year: Ord-2004
  • System Size: I/Os approx 500
  • Operator Stations: One more added
  • Remarks: Engineering, installation and commissioning done by UEC. After the 1st phase of successful and satisfactory working of the DCS system and our services. Another expansion was awarded for the system.

Bosicor Refinery
  • System Installed: Centum CS3000R3
  • Installation Year: 2004
  • System Size: I/Os approx 600
  • Operator Stations: 2
  • Remarks: Engineering, installation and commissioning done by UEC.

Oil Refinery
  • Plant: Oil Refinery
  • Services: Engineering, fabrication & installation of equipment, piping and other ancillary items.
  • Year: 2009

OGDCL

OGDCL Dhodak
  • System Installed: Centum CS3000R3
  • Installation Year: 2005
  • System Size: l/Os approx
  • Remarks: Supply, Installation, Engineering and commissioning of DCS system

Dhodak Gas Field (OGDCL) Expansion of the system
  • System Installed: Centum CS3000R3
  • Installation Year: Ord-2004
  • System Size: I/Os approx 200
  • Remarks: Engineering, installation and commissioning done by UEC. After the 1st phase of successful and satisfactory working of the DCS system and our services. Another expansion was awarded for the system.

Dhodak Gas Field (OGDCL)
  • System Installed: Centum CS3000R3
  • Installation Year: 2003
  • System Size: I/Os approx 1000
  • Operator Stations: 2
  • Remarks: Engineering Installation and commissioning by UEC. This is another retrofit job. Shifting from Bailey Single loops control system to our DCS.

Nur & Bagla Gas Condensate Fileds
  • Plant: Nur & Bagla Gas Condensate Filed
  • Services: Supply, Installation & Commissioning of Gas Metering Skid
  • Year: 2004

Dhakni Gas Metering Skid
  • Plant: Dhakni Gas Metering Skid
  • Services: Supply, Installation & Commissioning of Gas Metering Skid
  • Year: 2006

Fauji Fertilizer Company, Mirpur

Fauji Fertilizer Company, Mirpur
  • System Installed: Centum CS3000R3
  • Installation Year: 2005
  • System Size: l/Os approx
  • Remarks: Supply, Installation, Engineering and commissioning of DCS system

FFC Mirpur Mathelo
  • System Installed: Centum CS3000
  • Installation Year: Ord-2004
  • System Size: I/Os approx 1100
  • Operator Stations: 4
  • Remarks: Just being awarded.

FFC Goth Machi
  • System Installed: Centum CS3000
  • Installation Year: 2002
  • System Size: I/O approx 1200
  • Operator Stations: 3
  • Remarks: Engineering Installation and commissioning by UEC. This is another success story as we shifted the control from Old Foxboro single loops system (Spec200) while plant was running. Hence there was no production loss. Hence we become pioneers here also for the HOT CHANGEOVER job in Pakistan for such a complex process. This change over was completed without single shutdown of the process.

FFC (ESD/ System Integration Project)
  • System Installed: Prosafe
  • Installation Year: 2005
  • Remarks: Supply, Installation, Engineering and Commissioning

FFC Mirpur Mathelo
  • Plant: Fertilizers
  • Services: Supply of Control Valves.
  • Year: 2007

Fertilizers
  • Plant: Fertilizer
  • Services: Supply & Supervision of Control Equipment.
  • Year: 2006

Priemier Chemicals

Priemier Chemicals
  • System Installed: Centum CS3000R3
  • Installation Year: 2005
  • System Size: l/Os approx
  • Remarks: Supply, Installation, Engineering and commissioning of DCS and Field Instruments

Ethanol/Distillery
  • Plant: Ethanol/Distillery
  • Services: Complete installation & commissioning of LV/MV cables, switch gear etc.
  • Year: 1990

Sitara Chemicals

Sitara Chemicals
  • System Installed: Centum CS3000R3
  • Installation Year: 2005
  • System Size: l/Os approx
  • Remarks: Supply, Installation & Commissioning of DCS.

Rehmat Gas Field

Rehmat Gas Field Development Project
  • System Installed: Centum CS3000R3
  • Installation Year: 2004
  • System Size: I/Os approx 1200
  • Operator Stations: 4
  • Remarks: Engineering, installation and commissioning by UEC. The under is Petronass Carigali. This project included ESD system RTUs and Gas Metering Skid. Every system was successfully communicated with DCS which is acting as supervisory system for all the other systems. In this project RTUs were quite away from DCS and Fiber Optic links were used for the communication between DSC and RTUs

Metol Distillery

Metol Distillery
  • System Installed: Centum CS3000R3
  • Installation Year: Ord-2004
  • System Size: I/Os approx 500
  • Operator Stations: 3
  • Remarks: Engineering, installation and commissioning done by UEC.

Chemi Visco Fibres

Chemi Visco Fibres
  • System Installed: Centum CS3000
  • Installation Year: 2002
  • System Size: I/Os approx 600
  • Operator Stations: 2
  • Remarks: Engineering Installation and commissioning by UEC. This was another mile stone as this was the ever first plant of this kind in Pakistan and UEC not only supplied all field instruments but also successfully commissioned the project. Hence become a pioneer in the Visco Fiber Plant process.

Pakistan Synthetics

Pakistan Synthetics
  • System Installed: Centum CS3000
  • Installation Year: 2001
  • System Size: I/Os more than 1500
  • Operator Stations: 3
  • Remarks: Engineering Installation and commissioning by UEC. This project was mile stone and UEC completed the engineering of very complex process within one and half month.

PARCO Refinery

PARCO Refinery
  • System Installed: Centum CS
  • Installation Year: 1998
  • System Size: I/Os more than 12000
  • Operator Stations: more than 40
  • Remarks: Supplied by Yokogawa Singapore with involvement of UEC in all the phases from Engineering, Installation, commissioning and Project Management. This is the biggest DCS system installed in any industry in Pakistan and there is no failure todate in this system

Tri Pak

Tri Pak
  • System Installed: Centum XL
  • Installation Year: 1997
  • System Size: 1200
  • Remarks: Supply, Erection & Commissioning

Lucky-Gold Star, Qaiser-Lucky Chemicals

Lucky-Gold Star, Qaiser-Lucky Chemicals
  • Installation Year: 1995
  • Remarks: Di-Octy Phthalate (DOP) Supply, Erection & Commission of Distributed Control System

Hoeshst-Ravi Chemicals Ltd.

Hoeshst-Ravi Chemicals Ltd.
  • Installation Year: 1995
  • Remarks: Di-Octyl Phthalate (DOP) Maelic Anhydride (MA) & Ptahalic Anhydride (PA) Supply, Election & Commission of Distributed Control System

Nimir Chemicals

Nimir Chemicals
  • System Installed: Micro Excel
  • Installation Year: 1995
  • System Size: I/Os approx 400
  • Operator Stations: 3
  • Remarks: Engineering Installation and commissioning by UEC. This system is now obslete still it is running

Rupafil

Rupafil
  • System Installed: Micro Excel
  • Installation Year: 1993
  • System Size: I/Os approx 350
  • Operator Stations: 2
  • Remarks: This system is still running todate

Jamshoro Power Plant

Jamshoro Power Plant
  • System Installed: Micro Excel
  • Installation Year: 1988
  • System Size: Micro Excel
  • Operator Stations: 3
  • Remarks: Supplied by Mitsubishi Japan still this system is running trouble free

PDIL

Triconex
  • System Installed: Triconex
  • Installation Year: 2005
  • Remarks: Supply, Installation, Engineering and commissioning of ESD system

MOL Oil & Gas
  • Plant: MOL Oil & Gas
  • Services: Supply of Power, Control, Instruments and Data Communication cable.
  • Year: 2008

Natural Gas Processing Plant
  • Plant: Natural Gas Processing Plant
  • Services: Supply & Commissioning of Gas Metering Skid.
  • Year: Mar-05

Engro Chemicals

Engro Chemicalss
  • System Installed: AAB August System
  • Installation Year: 1998
  • Remarks: ESD System Installation Commissioning

PARCO Refinery

PARCO Refinery
  • System Installed: PROSAFE Safety PLC
  • Installation Year: 1998
  • System Size: I/Os more than 2000
  • Operator Stations: more than 40
  • Remarks: One of the biggest ESD system in Pakistan from Yokogawa.

United Ethanol

United Ethanol
  • Plant: United Ethanol
  • Services: engineering, fabrication & installation of equipment, piping and other ancillary items.
  • Year: 2010

Rafhan Maiz Products

Rafhan Maiz Products
  • Plant: Food product
  • Services: Supply of Field Instruments.
  • Year: 2008

Fields
  • Plant: Field
  • Services: Supply, Installation & Commissioning of Field Instruments.
  • Year: 2003

Glucose/Food
  • Plant: Glucose/Food
  • Services: Complete installation & commissioning of LV/MV cables, switch gear etc.
  • Year: 1987

Crystalline Chemicals

Crystalline Chemicals
  • Plant: Ehanol/Distillery
  • Services: Engineering, fabrication & installation of equipment, piping and other ancillary items.
  • Year: 2007-08

Packages Limited

Bulleh Shah Paper Mills
  • Plant: Bulleh Shah Paper Mills
  • Services: Supply of Control Valves.
  • Year: 2007

Bulleh Shah Paper Mills
  • Plant: Bulleh Shah Paper Mills
  • Services: Supply & Supervision of Control Equipment..
  • Year: 2006

Deutsche Babcock UAE

EPC
  • Plant: EPC
  • Services: Supply of Power and Control Cable , Supply, Engineering, Installation of Cable trays, conduit, Cable Laying, Cable Termination of Field Instruments.
  • Year: 2007

Al-Moiz Industries Limited

Sugar Mills
  • Plant: Sugar Mills
  • Services: Supply & Supervision of Control Equipment.
  • Year: 2006

Dewan Salman Fibre

Field-CCR
  • Plant: Field-CCR
  • Services: Supply, Installation & Commissioning of Control Room & Field Instruments.
  • Year: 2004

Crescent Textile

Field + CCR
  • Plant: Field + CCR
  • Services: Supply, Installation & Commissioning of Control Room & Field Instruments.
  • Year: 2003

Crescent Greenwood

Field + CCR
  • Plant: Field + CCR
  • Services: Supply, Installation & Commissioning of Control Room & Field Instruments.
  • Year: 2003

Sphire Fabrics

Field + CCR
  • Plant: Field + CCR
  • Services: Supply, Installation & Commissioning of Control Room & Field Instruments.
  • Year: 2003

Nishat Mills Ltd.

Field + CCR
  • Plant: Field + CCR
  • Services: Supply, Installation & Commissioning of Control Room & Field Instruments.
  • Year: 2003

Packages

Field
  • Plant: Field
  • Services: Supply, Installation & Commissioning of Field Instruments.
  • Year: 2003

United Sugar Mills Ltd.

CCR + Field
  • Plant: CCR + Field
  • Services: Supply, Installation & Commissioning of Control Room & Field Instruments.
  • Year: 2003

Glaxo Pakistan

Pharmaceutical Plant
  • Plant: Pharmaceutical Plant
  • Services: Supply of Control Equipment.
  • Year: February, 1988

Hoeshst-Ravi Chemicals

Di-Octyl Phthalate DOP, Maelic Anhydride (MA) & Ptahalic Anhydride PA
  • Plant: Di-Octyl Phthalate DOP, Maelic Anhydride (MA) & Ptahalic Anhydride PA
  • Services: Supply, Erection & Commission of Distributed Control System.
  • Year: Dec-94

ICI, Pakistan

Refined Sodium & Bi-Carbonate
  • Plant: Refined Sodium & Bi-Carbonate
  • Services: Supply of Control Equipment.
  • Year: Mar-1995

Sethi Industries

Glucose/Foods
  • Plant: Glucose/Food
  • Services: Complete installation & commissioning of LV/MV cables, switch gear etc.
  • Year: 1993-94

Pahrianwali Sugar Mills Ltd.

Sugar Mill
  • Plant: Sugar Mill
  • Services: Manufacturing, supply, installation & commissioning of control panels for LV & MV.
  • Year: 1992

Al-Quresh Paper & Board Mills

Paper & Board Mill
  • Plant: Paper & Board Mill
  • Services: Complete installation & commissioning of LV/MV cables, switch gear etc.
  • Year: 1985

Bhawalpur Paper & Board Mills

Paper & Board Mill
  • Plant: Paper & Board Mill
  • Services: Complete installation & commissioning of LV/MV cables, switch gear etc.
  • Year: 1984-5